The project:

Goldfinger

This involved the design, supply and installation of 2 No. twin wall stainless steel flue systems serving 2 No. Potterton dual flue boilers.

In the main boiler house, the chimney was lowered onto holding down bolts (previously supplied by Chimney & Canopy Systems) cast into a 2.5 metre square x 1 metre deep concrete foundation ready to receive the base section of the 800mm diameter free standing chimneys.

Chimney & Canopy Systems designed, supplied and installed the 18 metre tall freestanding chimney and internal flues within 4 weeks.