The project:
The brief for this project was to attend site and measure up 2 No. flue modifications to new water heaters. We recommended a pressure test be carried out to confirm the flue system integrity. Access to the terminal was impossible without expensive powered access so we removed sections just below the roof area and tested from this point. The flue system failed.
The existing flue systems were removed and replaced with 2 No. twin wall insulated fire rated P1 stainless steel flues. A T75 metre articulated truck afforded access allowing the existing external sections to be removed and replaced in one site visit keeping costs down for the customer. The new flues were pressure tested and passed with flying colours.
For more information, or if we can help with a project that you are working on at the moment, please contact our team of engineers on the following: